We have received an initial report of findings for Section 508 compliance from our Trusted Tested in OAST and need to review these findings and create a remediation plan, including creation of all necessary dev tickets.
[ ] Initial Report has been reviewed by Product, Design and Dev, as necessary.
[ ] Remediation Plan completed
[ ] Identify any existing "accessibility" tickets in the backlog that would address these remediation items
[ ] Dev tickets created, as necessary, to execute on the remediation plan.
Additional context
The 508 team have completed the 508 compliance review of the .gov Admin Tool as requested via ticket ICTR0044559.
Attached is the 508 report outlining the 508 violations identified for .gov Admin Tool. Based on the 508 assessment we have determined that remediation is required for this system/site.
NEXT STEPS
Please forward the defects to the development team to develop a plan for remediation. Afterward, please complete the attached CISA 508 Remediation Plan.doc and send it back to me.
Once the issues are addressed by your team, please reply to this email with the updated Remediation Plan (there is no need to enter a new ACMS ticket). I will conduct a re-evaluation of the site to verify the previously identified issues are corrected and ensure no new defects are encountered.
Issue description
We have received an initial report of findings for Section 508 compliance from our Trusted Tested in OAST and need to review these findings and create a remediation plan, including creation of all necessary dev tickets.
All report files are located on Google Drive here. Summary Report Complete Report (pdf from html)
Remediation Plan (template to be completed)
Acceptance criteria
Additional context
The 508 team have completed the 508 compliance review of the .gov Admin Tool as requested via ticket ICTR0044559.
Attached is the 508 report outlining the 508 violations identified for .gov Admin Tool. Based on the 508 assessment we have determined that remediation is required for this system/site.
NEXT STEPS
Please forward the defects to the development team to develop a plan for remediation. Afterward, please complete the attached CISA 508 Remediation Plan.doc and send it back to me.
Once the issues are addressed by your team, please reply to this email with the updated Remediation Plan (there is no need to enter a new ACMS ticket). I will conduct a re-evaluation of the site to verify the previously identified issues are corrected and ensure no new defects are encountered.
RESOURCES
ANDI Accessibility Testing Tool To expedite the remediation/retest process, your team’s developers should add ANDI to their browser’s Favorite Bar (no admin rights needed). This will allow them to perform quick 508 unit tests while making changes to fix the identified 508 defects. Unit testing will reduce the back and forth communication between our 508 Testing Team and the development team.
Helpful Links
• CISA Section 508 Program (sharepoint.com) • Technology needs of people who have disabilities (dhs.gov) • How to prioritize, monitor, and resolve Section 508 defects to minimize legal risk (dhs.gov)
• How to obtain a Section 508 Compliance Determination (CDF) (dhs.gov) • How to address Section 508 in change control (dhs.gov) • How to provide an Alternative Means (dhs.gov) • How to address Section 508 during operations & maintenance (dhs.gov)
Links to other issues
Relates to:
2835 (Registrar)