Closed jarumihooi closed 9 months ago
Should this non-comprehensive guide on slate types be downloaded into pdf and added to the dir? https://docs.google.com/document/d/1Xf43EpVzQbIOB-7KTadEyU3eam9xIvLlSGkjy4Ff2v4/edit
This PR was merged, then the main
history was re-written after that, obsoleting the history in this PR. See #51 for overwriting PR.
fixes partially #23 added slates readme