Previously the dev version is generated based on the development versions pushed to brandeis-llc nexus3 repository, but since the log4j incident, the nexus has been shut down and I don't think we need or want to revive it.
As a result, we need to update Makefile not to use the nexus instance to compile a deve version string.
Previously the
dev
version is generated based on the development versions pushed to brandeis-llc nexus3 repository, but since the log4j incident, the nexus has been shut down and I don't think we need or want to revive it. As a result, we need to update Makefile not to use the nexus instance to compile a deve version string.