climatetracecoalition / methodology-documents

Detailed, sector specific methodology documents
53 stars 10 forks source link

A few Turkish power plants have been lumped together #6

Open comready opened 7 months ago

comready commented 7 months ago

Glad to read on page 17 of the electricity generation methodology that you are doing quality control on Turkish power plants. Perhaps you already have all the info you need for this but if not let me know if I may be able to help as the names can be confusing. For example I see a few of the coal-fired plants do not quite match the official list. For example I suggest you

split ZETES into ZETES1, ZETES2 and ZETES3 split İÇDAŞ Bekirli out from İÇDAŞ Biga split Afşin-Elbistan into Afşin-Elbistan A and B

Also why are a few of the plants not named? Does that mean they are unnamed on OSM - if so I could try and add names there?