cmip6dr / cmip7_forward_look

Collection of documents and issues for CMIP7 data request
0 stars 0 forks source link

Confusion about future pre-industrial dates #46

Open martinjuckes opened 5 years ago

martinjuckes commented 5 years ago

Climate Service users find the dates provided in "pre-industrial" simulations confusing. In these simulations there is a discrepancy between the model time and the "validation time" (i.e. the calendar date in the real world which the model simulation is aligned with). The validation time is something like a continuously repeating 1850. In CF, standard_name = "time" is generally interpreted as validation time .. but changing the metadata of piControl simulations such that time can be safely interpreted as validation time would be disruptive. There is currently no standard name which would adequately describe the elapsed model time in these simulation. The forecast_period name is specifically defined for NWP as a difference between the start of the forecast and the validation time: it does not allow for the de-coupling between model and real time that happens when doing BC forced simulations.