For SFR FPT_ML_EXT.1 ‘Measured Launch of Platform and VMM’, the second element FPT_ML_EXT.1.2 says: “The TSF shall make these measurements available to the Management Subsystem.” The measurements should be more specifically identified such as with a reference to those selected in element FPT_ML_EXT.1.1.
For SFR FPT_ML_EXT.1 ‘Measured Launch of Platform and VMM’, the second element FPT_ML_EXT.1.2 says: “The TSF shall make these measurements available to the Management Subsystem.” The measurements should be more specifically identified such as with a reference to those selected in element FPT_ML_EXT.1.1.