Open billwuqin opened 6 months ago
Section 6.2 of draft-cprigf-bmwg-pwoerbench said: “ Procedure:
The measurement is done without activating the traffic generator.
” Is this case corresponding to traffic load level percentage 0%? If the answer is yes, Should this be called out explicitly?
Agreed
Section 6.2 of draft-cprigf-bmwg-pwoerbench said: “ Procedure:
The measurement is done without activating the traffic generator.
” Is this case corresponding to traffic load level percentage 0%? If the answer is yes, Should this be called out explicitly?