culibraries / folio

Project management for FOLIO implementation at CU Boulder
https://github.com/orgs/culibraries/projects/12
MIT License
0 stars 0 forks source link

Document Prospector processes #198

Open jwfuller opened 2 years ago

jwfuller commented 2 years ago

Printing Prospector Slips (Daily)

2 Step Process:

Step 1: (e-books for ILL)

FUNCTION: Notices: 20) Norlin Prospector: right click

Step 2: Prospector Slips

FUNCTION: Notices: 20) Norlin Prospector: right click

Checking Out Prospector Loans (Daily):

FUNCTION: INN-Reach Check-out to Remote Site: • scan barcode: • OK

Reports: (6 different reports):

FUNCTION: INN-Reach-Reports

  1. Report Type: Paged Too Long (run monthly)
    • Minimum days: 4
    • Maximum days: 5
    • Sort by: Item Location
    • Click Prepare
  2. Report Type: Requested Too Long
    • Minimum days: 80
    • Maximum days: 80
    • Sort by: Item Location
    • Click Prepare
  3. Report Type: In Transit Too Long (run monthly)
    • Minimum days: 21
    • Maximum days: 21
    • Sort by; Item Location
    • Click ‘Prepare’
  4. Report Type: Received Too Long (run 1-2 times a month)
    • Minimum days: 15
    • Maximum days: 15
    • Sort by; Item Location
    • Click ‘Prepare’
  5. Report Type: Returned Too Long (run monthly)
    • Minimum days: 21
    • Maximum days: 21
    • Sort by; Item Location
    • Click ‘Prepare’
  6. Report Type: Institutional Overdues: Reconciliation process (run once a year)
    • Minimum days: 182
    • Maximum days: 912
    • Sort by; Item Location
    • Click ‘Prepare’

Returning Unwanted Items:

FUNCTION: INN Reach Return Unwanted Item:

libraryfemme commented 2 years ago

The correct email to change to is CU-ILL@colorado.edu. (There's a dash between CU and ILL).