Is it possible to change the number of days in the variable stock_due_soon_days (in the integration)?
By default, it is equal to 5 days.
I changed this variable in Grocy, but there is no change in HA ( e.g. binary_sensor.grocy_expiring_products has the same value)
Hello!
Is it possible to change the number of days in the variable
stock_due_soon_days
(in the integration)? By default, it is equal to 5 days. I changed this variable in Grocy, but there is no change in HA ( e.g.binary_sensor.grocy_expiring_products
has the same value)