Closed TroyCMSSupport closed 1 month ago
@ian-sears @TroyCMSSupport I have not removed the flag, as the canonical URL has yet to change. However, as Veterans will see no discernible difference, this parent ticket can be closed once the editor is invformed. I advise leaving the URL change ticket open until we hear from Lighthouse that this change is made.
Closing per @omahane comment above. Leaving URL Change Ticket open. 8016
Intake
[x] What triggered this runbook? (Flag in CMS, Help desk ticket, Product team, VHA Digital Media) Trigger: Helpdesk Jira Ticket
[x] Link to associated help desk ticket (if applicable) Help desk ticket: VAHELP-7400
[x] Name of submitter (if applicable) Submitter: Jonathan Barczyk
[x] If the submitter is an editor, send them link to KB article: "How Do I Update My VAMC Facility's Basic Location Data?". Let them know that once VAST/Lighthouse has been updated 1/ the Facility Name will be automatically updated and 2/ we will use a Facility name change flag to update the facility's URL. We can notify them once we have been notified that VAST/Lighthouse has been updated.
[x] Link to facility in production: Facility CMS link: https://prod.cms.va.gov/maine-health-care/locations/caribou-va-clinic Production Link: https://www.va.gov/maine-health-care/locations/caribou-va-clinic Facility API ID: vha_402GA
Acceptance criteria
VAMC Facility name change
CMS help desk steps
Note: If the help desk is waiting on information from the facility staff or editor, add the "Awaiting editor" flag to the facility with a log message that includes a link to this ticket. Remove the flag when the ticket is ready to be worked by the Facilities team. Be sure to preserve the current moderation state of the node when adding or removing the flag. What happens: The name change is made in VAST, that syncs to Lighthouse which syncs to Drupal.
URL change ticket
18016
CMS Engineer steps
(Redirects deploy daily except Friday at 10am ET, or by requesting OOB deploy (of the revproxy job to prod) in #vfs-platform-support. Coordinate the following items below and canonical URL change after URL change ticket is merged, deployed, and verified in prod.)
Drupal Admin steps (CMS Engineer or Help desk)
Help desk will complete these steps or escalate to request help from CMS engineering.
Changed name
then save node (with moderation state = published)CMS Help desk (wrap up)