Open snps-davidla opened 5 months ago
Usage Limits Documentation:
Workflow Syntax Documentation:
Related Discussions/Issues:
This is not working when set at the job level alone.. We have a job called through a matrix in a reusable workflow and there appears to be no way to allow the job to run longer than 6hrs without setting the step timeout.
Our call stack looks like:
I am trying:
Result: The long running jobs are consistently cancelled at 6hrs in all cases.
Usage Limits Documentation:
Workflow Syntax Documentation:
Related Discussions/Issues:
This is not working when set at the job level alone.. We have a job called through a matrix in a reusable workflow and there appears to be no way to allow the job to run longer than 6hrs without setting the step timeout.
Our call stack looks like:
I am trying:
Result: The long running jobs are consistently cancelled at 6hrs in all cases.