eclipse-tractusx / sig-release

https://eclipse-tractusx.github.io/sig-release
Apache License 2.0
9 stars 10 forks source link

SDE: Maintenance 24.08 #567

Closed ciprianherciu closed 2 weeks ago

ciprianherciu commented 8 months ago

Description

This issue is not aiming for new or extended functionalities, but assuring all changes are implemented, that are required to ensure the compatibility/interoperability with depending components.

The required changes are depending on the features changes of the depending components, selected during the upcoming PI Planning. The full extent of required changes can only be defined, after all other features requests are approved and finalized in the PI Planning.

The preliminary maintenance changes might include:

Required enablers

Depending on the selected feature changes of the PI Planning.

Business value

As this is not a feature, it does not provide direct business value, but cares for not losing existing business value, by making sure existing business applications will work with the updated components as well.

Test scenarios

The existing test scenarios shall be passed as expected, as the functional scope of the component is not changed.

Acceptance criteria

Feature estimation

Not yet possible due to the dependency on the PI Planning.

Developer team

t.b.d.

Dependencies

jjeroch commented 8 months ago

Attention @ciprianherciu : Upcoming PI Planning Preparation

As we gear up for the forthcoming PI Planning session, it is crucial that all features under consideration align with our established Feature Quality Standards and Definition of Done (DoD) guidelines. To ensure your feature is thoroughly prepared and stands a strong chance of being prioritized, please provide comprehensive documentation that includes the following components:

  1. Feature Summary: An executive overview that encapsulates the essence and objectives of the feature.
  2. Change Description:
    • High-Level Overview: A succinct synopsis of the proposed changes and their overarching impact.
    • Detailed Analysis: An in-depth exploration of the specific alterations, including a clear exposition of the anticipated impact on existing systems.
  3. Impacted Components: A list identifying all system components that will be affected by the feature implementation, accompanied by a brief explanation of the nature of the impact.
  4. Acceptance Criteria: A set of clearly defined conditions that must be met for the feature to be considered complete and acceptable.
  5. Test Scenarios: A detailed outline of test cases that cover all functional paths of the feature to ensure robust validation and verification.

Please note that any feature submissions lacking these essential elements will not be eligible for consideration in the upcoming PI Planning. It is imperative that your documentation is both thorough and precise to facilitate a smooth and effective planning process.


Additionally to that, the milestone was deleted as well as I like to ask you to correct the ticket title. The release will be given as part of the PI planning

stephanbcbauer commented 7 months ago

was presented in open planning ⇾ contributors and committer are involved.

stephanbcbauer commented 5 months ago

Hello @ciprianherciu

Since the feature is a 24.08 feature and the development phase is coming to an end, we need a status on the feature.

If you need any clarification, please get in touch, thank you very much. Stephan

ciprianherciu commented 5 months ago
stephanbcbauer commented 4 months ago

Hello @ciprianherciu

In a few weeks, we want to publish Tractus-X Release 24.08. For this, we need a clear status about the features (which will be included in the release and which will be cancelled or postponed to the next release).

Currently, the feature is still in status Work in progress. Please update the status by 09.07.24 eob.

If the feature is not ready for release 24.08, or it is possibly not planned at all, please set the status to Not in release. Please remember that in this case, any dependent components must be informed.

Thank you and best regards.

ciprianherciu commented 4 months ago

@stephanbcbauer This topics are done:

If other minor adjustments are needed we will update. The named features will be deployed.

Sebastian-Wurm commented 2 months ago

@ciprianherciu : is this already done?

stephanbcbauer commented 2 months ago

@ciprianherciu This was a feature for milestone 24.08. Is this an ongoing topic? Is it closed? Moved?

MaximilianHauer commented 2 weeks ago

Closed by NSC because no progress. Please reopen and assign an upcoming release if needed.