Open emillind opened 6 years ago
The tests should be able to run after #1 is done. The log needs to be saved for the report.
I managed to run them and they all passed. However there are a lot of tests so maybe we will have to figure out which tests are affected by our refactor and just keep the logs for those?
The tests should be able to run after #1 is done. The log needs to be saved for the report.