I went to resubmit the configuration to have the proper 9 digits and though it showed me the right value in the interface, what was actually submitted on chain remained the same. Example, it showed me "10.000000000" but the actual proposal was for "10.0000" which was the original configuration.
I went to resubmit the configuration to have the proper 9 digits and though it showed me the right value in the interface, what was actually submitted on chain remained the same. Example, it showed me "10.000000000" but the actual proposal was for "10.0000" which was the original configuration.