Expected behavior
System should always open Select Connection Points dialog as per requirement rule:
Phosphate could be connected with the phosphate through R2-R1 as well as R1-R1 or R2-R2.
User should be asked which attachment points should be used to establish a bond.
Desktop (please complete the following information):
Steps to Reproduce
https://github.com/epam/ketcher/assets/26869421/b32b49c2-40e1-4213-b0af-928447fb2bcc
Actual behavior System establishes connection
Expected behavior System should always open Select Connection Points dialog as per requirement rule:
Desktop (please complete the following information):
Ketcher version [e.g. v2.4.2].