Closed eschweitzer78 closed 8 months ago
move to api v60 and upgrade build tooling
[ ] Tests for the proposed changes have been added/updated. [x] Code linting and formatting was performed.
What does this PR do?
move to api v60 and upgrade build tooling
The PR fulfills these requirements:
[ ] Tests for the proposed changes have been added/updated. [x] Code linting and formatting was performed.