Merges upstream geth v1.13.15 into optimism. This PR points at the outstanding branch for v.1.13.14 because a prior, not yet merged version (.13) has changes which we must build on
Additional Changes Required:
None. See v1.13.13 for changes it requires
Merges upstream geth
v1.13.15
intooptimism
. This PR points at the outstanding branch forv.1.13.14
because a prior, not yet merged version (.13) has changes which we must build onAdditional Changes Required: None. See
v1.13.13
for changes it requiresTesting
Tested via unit tests, and also via CI Workflow on the monorepo: https://github.com/ethereum-optimism/optimism/pull/10353
No Monorepo changes were required for this version beyond what was already needed for prior versions.