This is the main tracking issue for the EOFv1 checklist. If you have interest in one of the below tasks, don't hesitate to mention it here, open a PR, and link it in this issue. Drafts are welcome. We can edit this description and link the PR to the respective EIP(s) within its scope to track progress.
[x] EIP-3860: Limit and meter initcode (EOF prerequisite) history
Consult the EOFv1 checklist for specifics.
This is the main tracking issue for the EOFv1 checklist. If you have interest in one of the below tasks, don't hesitate to mention it here, open a PR, and link it in this issue. Drafts are welcome. We can edit this description and link the PR to the respective EIP(s) within its scope to track progress.