With the move to a unified projects/ hierarchy for default/example projects shipped with the brickstrap code, the validation logic for the -p switch needs a corresponding update to reflect this.
As per request, this PR isolates and supersedes the corresponding change from PR #39
With the move to a unified projects/ hierarchy for default/example projects shipped with the brickstrap code, the validation logic for the -p switch needs a corresponding update to reflect this.
As per request, this PR isolates and supersedes the corresponding change from PR #39