Closed DianaGawel closed 7 years ago
@2can I made corrections cc @jluczak
@2can Can we already merge it? I would like one part to be finished before I start the other one.
@2can Can you merge it and Asia will check for mistakes again later?
@DianaGawel I've written that @jluczak should merge after proof reading it locally
@DianaGawel it shouldn't block you to continue with the other elements, you can issue many PR's simultaneously
@2can It's not the case not it blocks me but it's inconvenient for me to do 5 different parts of docs and then come back to no 2, then no 4. But if I have to, I will do them simultaneously.
@DianaGawel please paste texts to some spellchecker, some typos are present
@jluczak please download changes from PR, read all texts and merge while some of them corrected (eg there is
Chechboxes
instead ofCheckboxes
)