Closed xulman closed 3 years ago
we should add:
into the "Create new job" dialog
I added the maximum runtime field in the form.
I added the maximum runtime field in the form. I also rearranged the fields in two tabs for basic and advanced node configuration options as suggested.
we should add:
into the "Create new job" dialog