Closed smcalilly closed 2 years ago
I changed the funded/unfunded calculations based on the directive from our last check-in. I wrote down the requirements in a comment in #189. This change required me to rework one of the totals in the CIP planner code.
Includes some changes to the fixtures.
Overview
Demo
Notes
I changed the funded/unfunded calculations based on the directive from our last check-in. I wrote down the requirements in a comment in #189. This change required me to rework one of the totals in the CIP planner code.
Includes some changes to the fixtures.
Testing Instructions