Open fungg0 opened 5 months ago
Am unsure if there is a need to number the arrows as the diagram should flow sequentially from top down already.
Numbering the arrows is also not taught in the module
Your response not required for this bug as the team has accepted the bug as it is.
Am unsure if there is a need to number the arrows as the diagram should flow sequentially from top down already.
Numbering the arrows is also not taught in the module