We are ready to deploy the MVP (Minimum Viable Product) of the GITAM Aero Astro Club website to the internet. This issue outlines the key steps and checkpoints required to ensure a smooth and successful deployment. Each step must be completed and verified before moving to the next.
Checklist:
[x] Design Finalizations
Review and finalize all design elements, including layout, colors, typography, and images.
Ensure the design aligns with the club’s branding and objectives.
Get approval from stakeholders on the finalized designs.
[ ] Front-End Development
Complete the implementation of the landing page based on the finalized designs.
Ensure responsiveness across different devices and screen sizes.
Optimize performance, including image optimization and minimizing load times.
Implement any required interactivity or animations.
[ ] Testing
Conduct thorough testing on various browsers (e.g., Chrome, Firefox, Safari) and devices (e.g., desktop, tablet, mobile).
Perform functionality tests to ensure all elements work as intended (e.g., forms, buttons, links).
Run performance tests to identify and resolve any bottlenecks.
Conduct accessibility testing to ensure the site is usable by all users, including those with disabilities.
Fix any bugs or issues identified during testing.
[ ] Review
Conduct a final review of the site with the team and stakeholders.
Gather feedback and make any necessary adjustments.
Ensure all content is accurate and up-to-date.
Verify that all SEO best practices have been implemented.
[ ] Deploy
Set up the production environment on Vercel or your chosen hosting platform.
Ensure all environment variables and configurations are correctly set up for production.
Deploy the site and perform a final verification on the live environment.
Monitor the deployment to ensure everything is functioning as expected.
Announce the site launch to the club and relevant stakeholders.
Expected Outcome:
The GITAM Aero Astro Club website MVP is successfully deployed and live on the internet, with all key features functional and ready for public access.
We are ready to deploy the MVP (Minimum Viable Product) of the GITAM Aero Astro Club website to the internet. This issue outlines the key steps and checkpoints required to ensure a smooth and successful deployment. Each step must be completed and verified before moving to the next.
Checklist:
[x] Design Finalizations
[ ] Front-End Development
[ ] Testing
[ ] Review
[ ] Deploy
Expected Outcome: The GITAM Aero Astro Club website MVP is successfully deployed and live on the internet, with all key features functional and ready for public access.