Closed dletran closed 2 years ago
Can this happen with other granularity?
@fofi I'll check it for month too, which probably it's the same, and I'll apply the same solution in that case
What about selectWeek ?
@fofi we don't allow selecting a "non-complete" week on the picker, although we could add the verification just in case we change that in the future so everything works the same way, wdyt?
What about selectWeek ?
@fofi we don't allow selecting a "non-complete" week on the picker, although we could add the verification just in case we change that in the future so everything works the same way, wdyt?
Whatever you think is best, on my side is enough
This pull request is being automatically deployed with Vercel (learn more).
To see the status of your deployment, click below or on the icon next to each commit.
🔍 Inspect: https://vercel.com/geoblink/design-system/BgTX4QZTPVgKZTq4drD5ea21RAmE
✅ Preview: https://design-system-git-feature-core-9155-fix-latest-16f916-geoblink.vercel.app