current cra and ira use shock curves. using yellow book, MEM 6- are not shocks
(function of Rbar). transition from blast wave to shock wave cra and ira model
needed
Original issue reported on code.google.com by grgrgrkn...@gmail.com on 3 Sep 2014 at 7:57
related to issue #200. If a load at a target used blast or shock cra/ira, that would have to be saved so that the correct PI was used (PIs would be tagged shock/blast).
Original issue reported on code.google.com by
grgrgrkn...@gmail.com
on 3 Sep 2014 at 7:57