What’s the probability that the host pops by 2 days before the event and the figures out the projector setup and the setup gets changed within those days? Any way to mitigate against that?
The idea that hosts should be required to drop in a couple of days in advance to fiddle with A/V gear is absurd, quite apart from the risk that Chinmay points out.
The requirement to revert the A/V setup is premature, but will make sense after suitable documentation is posted on the wall.
What’s the probability that the host pops by 2 days before the event and the figures out the projector setup and the setup gets changed within those days? Any way to mitigate against that?