Open annaseulgi opened 8 months ago
@bphan002 this ticket needs to remain in New Issue Approval until the Engineering Action steps are completed. I'm assuming you're investigating what those steps are at the moment.
Please edit this ticket to include Engineering's action steps once you've outlined what they are. Then we will assign the ready for dev lead
label so we can sign off on your steps. At that point, we will assign it to you to complete the work.
@bphan002 is requesting more detailed instructions to complete this ticket. I will leave it in New Issue Approval as draft
. Contemplating making this an epic and then creating the engineering tickets and linking it in the Engineering Issues section of this issue.
PM Instructions for correcting Design to Engineering Hand Off tickets to become Epics:
We need X for Y reason
(consider using text from Description of Requested Change)Launch
, set it to Map Page
or Product Maintenance
.Made corrections and kicking back to dev for more detailed instructions
Removing in-progress labels since this epic has enough info to track the Contact Form tickets
@ryanfchase @cottonchristopher Should we update this ticket based on our convo with Bonnie about embedding the Google Form?
I've updated this ticket to...
Thanks!
Overview
All tickets related to fixing our contact page that was broken and contained misleading instructions
PM Issue(s)
Design Issue(s)
Engineering Issue(s)
Resources
Figma Resources
Screenshot of Finalized Designs
Image which helps engineer understand where to look. (Replace the url and remove the markdown tags)
Screenshot of Figma file