Open audreychurch opened 1 year ago
USE TEMPLATE
button[Replace PROJECT NAME]
with the name of the project or CoP you are performing the audit forCRTL+H
or CMD+SHIFT+H
(Google's Find & Replace feature) and replace [Replace PROJECT NAME]
with the project's or CoP's name [Replace PROJECT INITIALS]
with project's or CoP's initials
Org Level Audits
folder in the Project's or CoP's DriveStart with Option 1 and if the Org Level Audits
folder is not in Starred
use Option 2
move icon
or file menu item, Move
in the spreadsheetStarred
Org Level Audits
folderMove here
Move
move icon
or file menu item, Move
in the spreadsheetShared Drives
Org Level Audits
folderMove here
Move
status: needs Slack audit document
label[channelname]
for each block with the channel name you found on SlackAdd Slack channel(s)
in the Action items of this issueUSE TEMPLATE
button[Replace PROJECT NAME]
with the name of the project or CoP you are performing the audit forCRTL+H
or CMD+SHIFT+H
(Google's Find & Replace feature) and replace [Replace PROJECT NAME]
with the project's or CoP's name[Replace PROJECT INITIALS]
with project's or CoP's initials
Org Level Audits
folder in the Project's or CoP's DriveStart with Option 1 and if the Org Level Audits
folder is not in Starred
use Option 2
move icon
or file menu item, Move
in the spreadsheetStarred
Org Level Audits
folder (indicated by the project or CoP initials)Move here
Move
move icon
or file menu item, Move
in the spreadsheetShared Drives
Org Level Audits
folderMove here
Move
Create Recommendations & Next Steps document
in the Action items of this issuestatus: needs post audit recommendations document
labelUSE TEMPLATE
button[Replace PROJECT NAME]
with the project or CoP name you are performing the audit for
Org Level Audits
folder in the Project's or CoP's DriveStart with Option 1 and if the Org Level Audits
folder is not in Starred
use Option 2
move icon
or file menu item, Move
in the spreadsheetStarred
Org Level Audits
folder (indicated by the project or CoP initials)Move here
Move
move icon
or file menu item, Move
in the spreadsheetShared Drives
Org Level Audits
folderMove here
Move
Details
tabhttps
till the /
before edit
Details
tab of the spreadsheet
Details
tabDetails
tab of the spreadsheet
Create Meeting Data Audit and Reconciliation Spreadsheet
in the Action items of this issuestatus: needs audit spreadsheet
labelSchedule
tab in the Zoom Setup (resource 1.0)Project Name
in column AFilter by values
, select Clear
OK
Schedule
tab of Zoom Setup spreadsheet (tabs are at the bottom)Copy to
Existing spreadsheet
Insert
Open spreadsheet
in the pop up message
Copy of Schedule
sheet to Overall Audit
Details
tab)Project Name
in column AFilter by values
, select Select All
OK
Delete selected rows
Project Name
in column AFilter by values
, select Select All
OK
OK
in the Sheet copied successfully
pop up messageProject Name
in column AFilter by values
, select Select All
OK
status: needs Zoom Setup data
label[x] open resource 4.0 in a new window
[x] view side by side with the issue window
[x] change the header color to #38761d
(the second to last green in the Fill color
option)
[x] change the header font color to white
[x] change the column name in Col C to Name of Meeting in Zoom Setup Spreadsheet
[x] change the column name in Col E to 'In Zoom Setup Spreadsheet'
[x] select column S
[x] right click and select Data Validation
[x] select the rule for column S
[x] select Remove Rule
[x] x out of the Data validation rules
panel
[x] hide columns D, N, O, U and V
[x] insert 4 columns to the right of column T
[x] name column U Auto Notes
[x] copy and paste the following formula in cell U2
=IF(AND(C2='hackforla.org-VRMS'!C4,C2='Calendar Event Audit'!A3,C2='Zoom Accounts Audit'!B3,C2='Slack Audit'!B3),'hackforla.org-VRMS'!K4&Char(10)&'Calendar Event Audit'!U3&Char(10)&'Zoom Accounts Audit'!L3&Char(10)&'Zoom Accounts Audit'!K23&Char(10)&'Slack Audit'!Y3&Char(10),"")
[x] check that column A has been auto filled
[x] Delete all empty rows except one
[x] check that the values for column T changed to YES
[x] check that the formula in column U is copied till the last filled row in this section
[ ] check that columns A,C,D,E,G and J have been auto filled
[x] delete all empty rows except the last one
[x] check that column A has been auto filled
[x] delete all empty rows except the last one
[x] check that the values for column J changed to YES
[x] check that the formula in column K is copied till the last filled row in this section
[x] check that the formula in column K is copied till the last row in this section
Filter out relevant project data
[x] select the funnel next to Team
in column G
[x] under Filter by values
, select Select All
[x] unselect your project name so that the checkmark next to it disappears
[x] select OK
[x] select the data starting from A3 till column H and the last row above row 54 (till the green border of the filter)
[x] right click and select Delete selected rows
[x] select the funnel next to Team
in column G
[x] under Filter by values
, select Select All
(only your project's name should appear)
[x] select OK
[x] undo the sheet filter by selecting the green funnel in the tool bar
[x] check that column B through H have been auto filled
[x] delete all empty rows except the last one
[x] adjust the rows under column A (Name of Meeting in Zoom Account) to match the sequence of meetings under column B (Name of Meeting in Zoom Setup Spreadsheet) in Section 3
[x] add an =
sign before the function in cell B2
[x] press Enter
at the end of the formula to save
[x] check that the values for column I changed to YES
[x] delete all empty rows except the last one
[x] check that the formula in column L is copied till the last row in this section
[x] access resource 2.0
[x] view side by side with the Slack Audit
sheet
[x] check that columns B through D have been auto filled
Please see the before and after screenshots below so you have an understanding of what needs to be done.
repeat the following steps for every channel name in resource 2.0
Slack Audit
sheet (e.g. [Replace channelname1] will be replaced with the first channel name in resource 2.0)[x] after all channel names have been added, delete all empty rows except the last one
Access the Overall Audit
tab
[x] add an =
sign in F2
[x] access the Zoom Accounts Audit
tab
[x] select the first cell in column J in Section 2
[x] press Enter
to save
[x] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[ ] add an =
sign in G2
[ ] access the Zoom Accounts Audit
tab
[ ] select cell A3
[ ] press Enter
to save
[ ] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[ ] add an =
sign H2
[ ] access the Calendar Events Audit
tab
[ ] select cell B3
[ ] press Enter
to save
[ ] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[ ] add an =
sign I2
[ ] access the Calendar Events Audit
tab
[ ] select cell C3
[ ] press Enter
to save
[ ] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[ ] copy and paste the following formula in cell J2
=IF(OR('Slack Audit'!E3="YES",'Slack Audit'!I3="YES",'Slack Audit'!M3="YES",'Slack Audit'!Q3="YES",'Slack Audit'!U3="YES"),"YES",'Slack Audit'!E3)
[x] press Enter
to save
[x] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[ ] copy and paste the following formula in cell K2
=TEXTJOIN(",",TRUE,IF('Slack Audit'!E3="YES",'Slack Audit'!F3,""),IF('Slack Audit'!I3="YES",'Slack Audit'!J3,""),IF('Slack Audit'!M3="YES",'Slack Audit'!N3,""),IF('Slack Audit'!Q3="YES",'Slack Audit'!R3,""),IF('Slack Audit'!U3="YES",'Slack Audit'!V3,""))
[x] press Enter
to save
[x] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[x] add an =
sign L2
[x] access the hackforla.org-VRMS
tab
[x] select cell F4
[x] press Enter
to save
[x] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[x] add an =
sign M2
[x] access the hackforla.org-VRMS
tab
[x] select cell G4
[x] press Enter
to save
[x] copy the formula down to the last row by dragging the tiny blue box at the end of the cell all the way down
[x] check the box for Setup Automation Formulas for the Audit in the Action items of this issue
[x] close the tabs you just opened (wiki, spreadsheet)
[x] hide this comment as RESOLVED, you are finished with this step
Calendar Event Audit
tab (There are 3 sections in this sheet)Zoom Account
, use the following:
Unknown
Personal
https://us02web.zoom.us/j/4451450308?
, select Bonnie's Zoom
Section 3: Data Pulled from Zoom Setup Spreadsheet
NO
in column T (In Zoom Setup Spreadsheet) for each meeting you add to this section
Next Steps
tab, under Team Calendar
, adding additional rows if needed
Perform Calendar Event Audit
in the Action items of this issuestatus: needs calendar event audit
labelZoom Accounts Audit
tab (There are 3 sections in this sheet)
YES
for meetings in column ANO
for blanks in column AYES
for meeting in column A if Recurrence Matches Zoom Setup Spreadsheet Data BelowNO
for meeting in column A if Recurrence Doesn't Matches Zoom Setup Spreadsheet Data BelowSection 1
but not in Section 3: Data Pulled from Zoom Setup Spreadsheet
(leave column B blank)
Next Steps
tab, under Zoom Accounts
, adding additional rows if needed
Perform Zoom Accounts Audit
in the Action items of this issuestatus: needs Zoom accounts audit
labelRepeat for each channel name in resource 2.0
/remind list
in a comment and hit enterDraft
from the file name
Perform Slack Audit
in the Action items of this issuestatus: needs Slack audit
labelDetails
sheet in resource 4.0, paste the URL in place of https://www.hackforla.org/projects/[Replace PROJECT-NAME]
, B6
hackforla.org/VRMS
tab in resource 4.0 (There are 3 sections in this sheet)No events on website (check if applicable, which completes VRMS audit)
box if there's no meeting data on the project's page
No
Next Steps
tab, under hackforla.org/VRMS
, adding additional rows if needed
https://www.hackforla.org/projects/[Replace PROJECT-NAME]
, in B6 with https://www.hackforla.org/communities-of-practice
hackforla.org/VRMS
tab (There are 3 sections in this sheet)No events on website (check if applicable, which completes VRMS audit)
box if there's no meeting data on the CoP's page
No
Next Steps
tab, under hackforla.org/VRMS
, adding additional rows if needed
Perform hackforla.org/VRMS Audit
in the Action items of this issuestatus: needs hackforla.org/VRMS audit
labelNext Steps
tabAction Required
, add the appropriate recommendation from the list below
Update Meeting Titles
Update Calendar Invites
Update VRMS
Update Slack channels
Update Zoom Setup spreadsheet & Zoom accounts
Cancel a meeting permanently
Reconcile the meetings in Section 2 by updating/deleting the mentioned occurrences
None
[Replace PM HANDLE]
to team lead's Slack handle (add more than one if required)[Replace ISSUE # & LINK]
with this issue number and linkDraft
from file name
#### Slack Communication
in a new comment, paste the sent message in
and save
status: needs recommendations
labelstatus: waiting on team feedback
labelAdd recommendations
in the Action items of this issueI did not find any additional Slack channels.
Overview
We need to audit all calendar events for a given project to match the Zoom Setup and Zoom Audit Spreadsheet so that we can optimize the availability of the Zoom rooms and have the most current meeting information.
Prerequisite
If you are not the PM on the project this issue is for
If you are the PM on the project this issue is for
Content Manager
if the drive is not already shared with the emailAction Items
Setup Access Through Proper Profile
Access GitHub
Add Org Level Audits folder to Starred
If you do not see the project's drive in the list of shared drives, see Prerequisite
Org Level Audits
folder in the project's shared driveAdd to starred
Prep
For each of the following items, there are instructions in the wiki. You must do them in must do them in order.
During these tasks you will be asked to add link to resources, and that section is at the bottom of this issue (go view it now).
prep
labeladmin prep
labelPrioritized Backlog
on the project boardOrg Level Audits
folder from StarredOrg Level Audits
folder (indicated by the project or CoP initials)Remove from starred
Admin Prep
admin prep
labelaudit
labelAudit
NOTE: There are autogenerated notes in the spreadsheet you will be using so please do not edit any
Auto Notes
columnsaudit
labelreconciliation
labelPrioritized Backlog
on the project boardReconciliation
Recommendations and next steps
Resources/Instructions
1.0 Zoom Setup Spreadsheet 2.0 Youth Justice Nav: Slack Audit Document 3.0 Youth Justice Nav: Post Audit Recommendations 4.0 Youth Justice Nav: Meeting Data Audit and Reconciliation Spreadsheet