Closed GoogleCodeExporter closed 9 years ago
Ok this issue should be fixed in the 1.3.6 build you need to update your DB as
changes have been made. To run a strategy you need symbols for that day and for
the 5min bar strategy you need to run b4 9:30EST as the trigger for entry is
the completion of the 9:35am bar if you ran outside that time frame the
strategy will run and close on the next completion of a bar after 10:30am.
Probably best to go to strategy tab and check the strategy code for all the
rules.
Thanks
Original comment by simon.allen
on 11 Jan 2012 at 9:59
OK 1.3.8 build will run with 1.6/1.7 JDK there was a problem with class loader
that occured in JDK 1.6.26 and later versions.
Original comment by simon.allen
on 14 Jan 2012 at 3:47
Original comment by simon.allen
on 3 Jul 2012 at 1:26
Original issue reported on code.google.com by
charles....@gmail.com