Have you considered connecting the power ground from the J pin of the controller to the screw ground on each controller, then only running the screw ground to the central ground terminal? That would go from 12 to 6 connections at the vertical terminal and maybe clean stuff up.
On Wed, Mar 27, 2013 at 9:40 AM, PayneTrain notifications@github.comwrote:
Will make a more stable connection to the new ground terminal by allowing the GND bolt to pass through the loop, rather than sliding the fork into the terminal
— Reply to this email directly or view it on GitHubhttps://github.com/hmartiro/project-thesis/issues/87 .
Great idea, I'll do that:) On Mar 27, 2013 1:29 PM, "Hayk Martirosyan" notifications@github.com wrote:
Have you considered connecting the power ground from the J pin of the controller to the screw ground on each controller, then only running the screw ground to the central ground terminal? That would go from 12 to 6 connections at the vertical terminal and maybe clean stuff up.
On Wed, Mar 27, 2013 at 9:40 AM, PayneTrain notifications@github.comwrote:
Will make a more stable connection to the new ground terminal by allowing the GND bolt to pass through the loop, rather than sliding the fork into the terminal
— Reply to this email directly or view it on GitHub< https://github.com/hmartiro/project-thesis/issues/87> .
— Reply to this email directly or view it on GitHubhttps://github.com/hmartiro/project-thesis/issues/87#issuecomment-15538471 .
Crushed
Will make a more stable connection to the new ground terminal by allowing the GND bolt to pass through the loop, rather than sliding the fork into the terminal