Closed rajuAhmed1705 closed 2 months ago
Visit the preview URL for this PR (updated for commit 97e1fa4):
(expires Mon, 19 Aug 2024 10:15:10 GMT)
🔥 via Firebase Hosting GitHub Action 🌎
Sign: 2149dad49ed83535217e50d5c18c0c8c90da629b
Is this ready for review? @rajuAhmed1705
@johannesvedder, except for the task with the intervention mismatch problem. everything is solved. I actually cannot create a study without an intervention task. So, I'm trying to figure out the other way around.
@johannesvedder, except for the task with the intervention mismatch problem. everything is solved. I actually cannot create a study without an intervention task. So, I'm trying to figure out the other way around.
This used to be possible in the past and we might need to re-enable this again in order to allow washout phases, as long as we have the adaptive schedule alternative. So you can revert this commit if you would like.
@johannesvedder, except for the task with the intervention mismatch problem. everything is solved. I actually cannot create a study without an intervention task. So, I'm trying to figure out the other way around.
This used to be possible in the past and we might need to re-enable this again in order to allow washout phases, as long as we have the adaptive schedule alternative. So you can revert this commit if you would like.
scope of testing: https://trello.com/c/yOMuCoYa