The conversion between AD and BP is not working for at least one Period:
In BugsCEP:
Post Medieval (PostMed) = 50 BP - 1550 AD
In SEAD:
Post Medieval (PostMed) =-50.00000 - 1550.00000 BP
Should be
Post Medieval (PostMed) =-50.00000 - 400.00000 BP
We need to check whether this is a systematic import error.
This has implications for our connections to other databases in that we are transferring incorrect data.
The conversion between AD and BP is not working for at least one Period: In BugsCEP: Post Medieval (PostMed) = 50 BP - 1550 AD In SEAD: Post Medieval (PostMed) =-50.00000 - 1550.00000 BP Should be Post Medieval (PostMed) =-50.00000 - 400.00000 BP
We need to check whether this is a systematic import error. This has implications for our connections to other databases in that we are transferring incorrect data.