Closed rete closed 6 years ago
@gaede I have modified the Beam sizes for the 500 GeV to make it consistent with what we have in the ILC TDR. But now the numbers are a bit different from the one used in the MC prod. Is this a problem ? Also we still have remaining steering files for l5/s4 models. Should I cleanup this ?
With all the changes that are 'incompatible' with the v02-00-01 production, we need to make sure that this gets released only as v02-00-02-XX in order to avoid confusion.
Please avoid to use more than 9 characters for the version number. It is used as a part of the directory name and file name, which are already close to the 128 characters limit imposed by DIRAC. Physics group is wishing to use a longer process name, which is also a part of filename. For me, v02-02 is preferable as a next version of v02-00-01. It is unlikely that we use more than 2x2 digit version number by the end of ILC.
BEGINRELEASENOTES
BeamCalBackgroundFile
into calibration filesENDRELEASENOTES