The Framework for Optimization of ResourCes and Economics is a collection of software tools, models, and datasets acquired and developed under the Integrated Energy Systems (IES) program to enable analysis of technical and economic viability of myriad IES configurations. FORCE is the consolidating interface and data repository for all the IES toolsets ranging from macro technoeconomic analysis to transient process modeling and experimental validation for integrated energy systems.
MIT License
7
stars
13
forks
source link
Adds a use case for chemical plant nuclear integration, based off work from the DOW CRADA. #29
What issue does this change request address? (Use "#" before the issue to link it, i.e., #42.)
Not Applicable
What are the significant changes in functionality due to this change request?
Adds a use case for chemical plant nuclear integration, based off work from the DOW CRADA.
For Change Control Board: Change Request Review
The following review must be completed by an authorized member of the Change Control Board.
[x] 1. Review all computer code.
[x] 2. Make sure the Python code and commenting standards are respected (camelBack, etc.) - See on the wiki for details.
[x] 3. Automated Tests should pass, including run_tests, pylint, and manual building tests.
[x] 4. If significant functionality is added, there must be tests added to check this. Tests should cover all possible options. Multiple short tests are preferred over one large test.
[x] 5. If the change modifies or adds a requirement or a requirement based test case, the Change Control Board's Chair or designee also needs to approve the change. The requirements and the requirements test shall be in sync.
[x] 6. The merge request must reference an issue. If the issue is closed, the issue close checklist shall be done.
Pull Request Description
What issue does this change request address? (Use "#" before the issue to link it, i.e., #42.)
Not Applicable
What are the significant changes in functionality due to this change request?
Adds a use case for chemical plant nuclear integration, based off work from the DOW CRADA.