Set the final score automatically by the system – then ask inspector “Do you agree with the system-calculated score?” with yes/no options. If No, then inspector is required to provide a user-input grade (pick from dropdown, should be an A to F grade), with a required comment as to why they disagree
The translation of total score to a letter grade will depend on some other items PTC is scheduled to provide feedback on (namely, how to see “no maintenance required”).
We need to think through how multiple inlets/forebays/inlets with sumps will be rolled up into this – because if you have 8 inlets this could artificially inflate the score to a poor rating. Again this is likely to depend on how “no maintenance required” is tracked in the system
Set the final score automatically by the system – then ask inspector “Do you agree with the system-calculated score?” with yes/no options. If No, then inspector is required to provide a user-input grade (pick from dropdown, should be an A to F grade), with a required comment as to why they disagree
The translation of total score to a letter grade will depend on some other items PTC is scheduled to provide feedback on (namely, how to see “no maintenance required”).
We need to think through how multiple inlets/forebays/inlets with sumps will be rolled up into this – because if you have 8 inlets this could artificially inflate the score to a poor rating. Again this is likely to depend on how “no maintenance required” is tracked in the system