Closed BenjaminPelletier closed 7 months ago
This project is now complete. The Gate 3 CI does not show 100% green because the CI DSS instance is not deployed in a secure production context, but those requirements have been verified green in a production instance.
This issue describes overall completion of basic SCD automated testing. The corresponding Project is Basic SCD automated testing.
Goal
Provide the ability to detect non-compliance with all ASTM F3548-21 requirements applicable to basic strategic coordination that are most effectively validated with automated testing. Basic strategic coordination in this context:
Many requirements are not effectively validated with automated testing at this point. The requirements that are expected to be effectively validated with automated testing are now explicitly listed in
gate3
of thef3548_self_contained
CI test configuration. Thef3548_self_contained
CI test configuration is expected to continue to represent testing of basic strategic coordination in accordance with this project for the duration of the project.Measurement of success
This project will be successful when the "Requirement verification status" for uss1 in gate3 of the f3548_self_contained CI test is green and indicates "Pass" when f3548_self_contained accurately represents testing of basic strategic coordination per this project.
This outcome is achieved by obtaining at least one Passing check for each requirement listed in the table on that page.
Schedule
Target: end of Q1 2024
Is it done yet?
The associated project (see right hand side) should contain outstanding issues required for the completion of this project (including this one).