The availability field should be added to the top level of the Cooperation entity. This field will allow setting the availability of resources linked within the entity. The availability field should be added alongside the resource and resourceType fields for each resource included in the cooperation:
This update will enable controlling the availability of resources as links within the scope of the current cooperation, without affecting the availability of the same resources in other cooperations.
Add
availability
field toCooperation
entityThe
availability
field should be added to the top level of theCooperation
entity. This field will allow setting the availability of resources linked within the entity. Theavailability
field should be added alongside theresource
andresourceType
fields for each resource included in the cooperation:This update will enable controlling the availability of resources as links within the scope of the current cooperation, without affecting the availability of the same resources in other cooperations.