I am testing the report configuration screen in the tom-ui 0.12 pre-release version.
In the widget group "Project", there is a checkbox "Include subprojects". However, whether it is checked or not, the report's total time will always be the project's total time including time tracked in its subprojects. What changes is the following, and only if "Splitting: Project" is checked:
With "Include subprojects" unchecked, splitting by project is shown as one line with the name of the project.
With "Include subprojects" checked, splitting by project is shown as one line per sub-project that has timeframes assigned to it.
If this behavior is as intended, then it seems more intuitive to find the control for it as a new checkbox "Subproject" in widget group "Splitting".
I am testing the report configuration screen in the tom-ui 0.12 pre-release version.
In the widget group "Project", there is a checkbox "Include subprojects". However, whether it is checked or not, the report's total time will always be the project's total time including time tracked in its subprojects. What changes is the following, and only if "Splitting: Project" is checked:
If this behavior is as intended, then it seems more intuitive to find the control for it as a new checkbox "Subproject" in widget group "Splitting".