I tried to change the date format to %d/%m/%Y but when adding an event, it keeps telling me that I have not completed the event date information (even though the event's date is pre-filled in the field) and I cannot save the event. If I set it back to the default format %m/%d/%Y, I can save events.
I tried to change the date format to %d/%m/%Y but when adding an event, it keeps telling me that I have not completed the event date information (even though the event's date is pre-filled in the field) and I cannot save the event. If I set it back to the default format %m/%d/%Y, I can save events.
I am using Revo 2.2