when moving an EPI isolation back to live in place the IO role should have to do a field check of each point, therefore they should go through the same process as when executing an isolation in the first place. i.e. tick of in the system each point. Perhaps also verification signature too?
when moving an EPI isolation back to live in place the IO role should have to do a field check of each point, therefore they should go through the same process as when executing an isolation in the first place. i.e. tick of in the system each point. Perhaps also verification signature too?