4/20/2020 NK - No error but we may need to have some sort of CHECKCODE for this. I will open a ticket for this.
The project has a warehouse space which has an exhaust requirement based on the vent function below but no exhaust system is specified. I believe the Baseline is showing the energy for the exhaust system and the proposed is not since there is no system. I tested it with another general ventilation function under the warehouse and the difference went away.
Original comment by: joesinger12
Original comment by: joesinger12
Original comment by: joesinger12
Original comment by: joesinger12
Original comment by: joesinger12
CEC - EP model where process is showing up only on Standard Design and not proposed design.