Enter zero for the probability rate in a leaf node, and select the "check probability consistency report", the report will not generate an output. A zero rate for probability is likely to be a user typographical error, and checking this with the consistency report would be helpful.
Enter zero for the probability rate in a leaf node, and select the "check probability consistency report", the report will not generate an output. A zero rate for probability is likely to be a user typographical error, and checking this with the consistency report would be helpful.
EMFTA 1.0.0.201508132201 edu.cmu.emfta.feature.feature.group SEI/CMU