Open KCI-Ablowers opened 5 years ago
@KCI-Ablowers Nice work!
@KCI-Ablowers Nice work!
- I think we inadvertently skipped surveyed length but it seems like it should go into the UG BMP column
- We said US/DS depths would be a part of the inventory.
Updated table.
@talllguy -
It looks like the size, material, etc already exist in the Treatment Pipe -
Add to BMP Inspection (INSPECTION table)
2/5/2020 Use same BMP inspection table but have special form for UG UG geometry is strictly for reference
Ask at next meeting: impacts of inspection table schema change and (later) geometry schema changes.
We touched on this at a WAB implementation today.
During the COVID-19 workflow handoff, Andrew set up a form in AGOL-hosted that supports the schema changes outlined in this plan. Inspections recorded by that form are not ETL'd back to SHA production. The team discussed the potential future implementation of such and ETL but no definitive timeline was set. Thus, the UG inspection data will remain in AGOL-hosted only and any ETL would be manual. @KCI-Ablowers sent this database dump of the combined form used in 2020. UG_BMP_Inspection_Combined_20200909.zip
@ladejobi @johnshiu @KCI-Ablowers
Found some of these layers and am reopening this for reference.
Background
During the Treatment Pipe Schema discussion on 7/23/2019, the team determined that the UG Treatment Pipe Inspection survey form should be rolled up into the UG BMP Inspection survey form, eliminating the separate UG Treatment Pipe Inspection form. The team also determined items that would be removed from the treatment pipe inspection and rolled up to the treatment pipe geometry. Those items are listed below.
Solution
@talllguy The question marks represent where I was unsure what happens to those fields. If you can recall, please update the table.