SITE NAME: BA-GRP3-RKK-033 BA-GRP3-RKK-047 BA-GRP3-RKK-048 BA-GRP3-RKK-050 BAGr3-RKK-032B BAGr3-RKK-030 BAGr3-RKK-031A BAGr3-RKK-035 BAGr3-RKK-034A BAGr3-RKK-032A BAGr3-RKK-032C BAGr3-RKK-031B BAGr3-RKK-034B

CONFLICT FEATURE: SHA_LINE_CTP_MAJOR_2015 CRM RECOMMENDED STATUS: Remove from consideration CONFLICT DESCRIPTION:BA-GRP3-RKK FI site within project boundary of I-695 (MD 41 to MD 147) CTP project. The project includes auxiliary lanes, removal of the cloverleaf ramp, replacement of the bridge, highway drainage and stormwater, and reforestation.

kerrymcmahon commented 9 years ago

Are we 100% sure this project is happening? Does the CTP pdf show it in design?

jseipp commented 9 years ago

Yes - not only does it show online that it is currently under construction (http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectSchedule.aspx?projectno=BA458513), I have also been over on that side of the Beltway recently and the whole area is a work zone with active construction. This section is a portion of the entire CTP project. I only included sites that were located between MD 41 and MD 147 because that is the only portion currently in design and/or construction. The other two sections appear to be on hold at the moment so I left those sites in.

kerrymcmahon commented 9 years ago

Ah yes, I do recall seeing construction over there. I think it's the portion to 83 that is no longer happening. I will update the DB when it becomes available.

kerrymcmahon commented 9 years ago

I have updated these sites in the database to RC