- base on Google code and Google docs logs.
- state what was planned to do and what and by whom was actually done.
- mention that our team moved from a scheme, where everyone was doing something
from a specific area to everyone doing bits of everything. As we see it, it
goes against the strengths and weaknesses that we listed in the first week.
Original issue reported on code.google.com by hollgam on 8 Nov 2011 at 3:50
Original issue reported on code.google.com by
hollgam
on 8 Nov 2011 at 3:50