Closed viniarck closed 9 months ago
It'll be worth having a more extensive integration tests to fill the gap as e2e tests will only be developed in the future:
This is for covering inter-EVC scenarios and asserting the expected flows:
failover_path
primary_path
backup_path
This ring topology with external loops will be used to derive mef_eline flows:
mef_eline
It'll be worth having a more extensive integration tests to fill the gap as e2e tests will only be developed in the future:
This is for covering inter-EVC scenarios and asserting the expected flows:
failover_path
availableprimary_path
onlyprimary_path
andbackup_path
This ring topology with external loops will be used to derive
mef_eline
flows: