let's make a plot of the final signal acceptance for the MET region as a function of the neutralino lifetime. That is to say, in that screenshot, we look at line 25 and read off the value 0.01 from the Acc column. We want that number for the 1 TeV, 200 GeV mass point (for stop and chi0 masses respectively) as a function of the lifetime to see how it changes.
For the samples mentioned here:
https://github.com/lawrenceleejr/DVMuReint/issues/5#issuecomment-1090331895
let's make a plot of the final signal acceptance for the MET region as a function of the neutralino lifetime. That is to say, in that screenshot, we look at line 25 and read off the value 0.01 from the Acc column. We want that number for the 1 TeV, 200 GeV mass point (for stop and chi0 masses respectively) as a function of the lifetime to see how it changes.