[x] Update to latest master of Buildings library (this will require updates to the controls as the master uses the revised version of CDL that refactors Add and some other blocks.
[x] Make SystemModel.BoilerPlant to pass regression tests. [Karthik]
[x] Add condensing boiler model [Michael]
[x] Remove sampling that happens every 1 second in SystemModel.BoilerPlant.Validation.System (as of commit ff90d65df90eb6ece0b388510165449c09b0c99c) [Karthik]
[x] Add boiler plant to SystemModel.BoilerPlant.
[ ] Add chiller plant to SystemModel.ChillerPlant.
[ ] Add heat loss of distribution pipes. Use 1/2 inch Armaflex for pipes, assume valves etc are insulated.
[ ] Add model that combines boiler plant, chiller plant and VAV system.
[ ] Add post-processing script.
[x] Size air-side system.
[ ] Size boiler plant.
[ ] Size chiller plant.
[ ] Make sure building static pressure is not higher than about 12 Pa. Otherwise add a relief fan.
I have submitted a PR with the required boiler plant files here. I have listed some additional questions there and would like some guidance about referencing the boiler plant controller classes.
This issue is to conduct the case study with primary and secondary system.
The models are in
obc/examples/case_study_4_fullHVAC
, for instructions see theREADME.md
file in https://github.com/lbl-srg/obc/tree/issue92_caseStudyFullHVAC/examples/case_study_4_fullHVACThe development branch is
issue92_caseStudyFullHVAC
.To do:
Add
and some other blocks.SystemModel.BoilerPlant
to pass regression tests. [Karthik]SystemModel.BoilerPlant.Validation.System
(as of commit ff90d65df90eb6ece0b388510165449c09b0c99c) [Karthik]SystemModel.BoilerPlant
.SystemModel.ChillerPlant
.