Surveyor within 2 weeks of booking
Install within 1 month of 4-6 weeks total - London tends to be quicker
Sanding vibrations fine
Filling cracks between boards - only around skirting, could do caulk
Any changes to plumbing and drainage below floor do that first
Insulate
Then sand because floorboards will be lifted
Or go in the kitchen floor
10/07 paid for survey, they will call to schedule
When they do survey:
Let them know re damp, confirm there will be no issues
Find out if they could gain access under stairs so we know if they need to do install before kitchen fitted or could be anytime (Louli money?)
https://householdquotes.co.uk/underfloor-insulation-costs/
Surveyor within 2 weeks of booking Install within 1 month of 4-6 weeks total - London tends to be quicker Sanding vibrations fine Filling cracks between boards - only around skirting, could do caulk
Any changes to plumbing and drainage below floor do that first Insulate Then sand because floorboards will be lifted
Or go in the kitchen floor
10/07 paid for survey, they will call to schedule
When they do survey: